Do You Need Consent for a Pergola in Hawke’s Bay?
Summer’s not far off, and a lot of Hawke’s Bay backyards are getting a second look. A pergola is one of the most common things people ask us about. It gives you some shape and shade over a deck or patio, and it’s a good frame for climbing plants.
The first question is usually about paperwork. Do you need consent for a pergola? The short answer: an open pergola without a roof usually doesn’t need building consent. Once you add a roof or covering, it’s a different story.
What counts as a pergola

A pergola is an open structure on posts, with beams or rafters across the top. The top stays open. You might add battens or grow a vine over it, but there’s no solid roof.
MBIE’s guidance says a pergola can be freestanding or attached to the house. Both count.
When you don’t need consent for a pergola
Schedule 1 of the Building Act lists work that doesn’t need building consent. Building work in connection with a pergola is on that list.
According to MBIE’s exemptions guidance, there’s no size limit on a pergola under this exemption. The catch is simple: it must not be roofed. The guidance also says you don’t legally need a Licensed Building Practitioner to build an exempt pergola.
That doesn’t mean anything goes. All building work has to meet the Building Code, even when it doesn’t need consent. A pergola still needs to be properly built, properly fixed and able to handle the weather. If it’s attached to the house, how it connects matters too.
What changes when you add a roof
This is where people get caught out. Add polycarbonate sheets, a solid roof or plastic sheeting, and the pergola exemption no longer applies.
MBIE gives an example of a 32 m² pergola with clear polycarbonate roofing. Because it’s roofed, it isn’t covered by the pergola exemption and needs building consent. The same goes for one with plastic sheeting forming a roof and walls.
Some roofed structures may still fit under a different exemption. Schedule 1 has separate rules for awnings, porches and verandas, carports and shade sails. Each comes with its own conditions, such as floor area limits, being on the ground or first-storey level, and in some cases needing a Licensed Building Practitioner or a chartered engineer involved. Shade sails, for example, have a size limit and must be at least 1 metre from any legal boundary.
The details matter, so check the exact conditions before you assume a covered structure is exempt. If you’re thinking about a louvre system or a polycarbonate cover, talk it through before you order anything. The roof is what changes the consent picture.
Building consent isn’t the only rule
Even when your pergola doesn’t need building consent, the district plan still applies. MBIE’s guidance says exempt work still has to comply with other legislation, including the Resource Management Act.
In practice, that can mean rules about how close you build to a boundary, how tall a structure can be near a neighbour, or how much of your section is covered. Napier City Council and Hastings District Council each have their own district plan, and some areas have extra rules. If your pergola is going near a boundary, it’s worth checking with council first.
Things to think about before you build
- Sun and shade. Watch where the sun sits through a summer afternoon before you lock in the position.
- Attached or freestanding. Attaching to the house can work well, but the connection needs to be done right.
- Ground and footings. What’s under your lawn or patio affects how the posts go in.
- Water. If you’re adding any cover, think about where the rain goes. MBIE notes that new drains must be laid by an authorised drainlayer.
- Neighbours. If it’s close to the fence line, a quick chat early can save trouble later.
- Lighting and power. Lights or power outlets are a job for an electrician, so plan them in early.
Planning a pergola this summer?
We help homeowners around Napier, Hastings, Havelock North and the wider Hawke’s Bay with pergolas, decks and outdoor living areas.
If you’re thinking about a pergola, send us your address or suburb, a few photos of the area and a rough idea of what you have in mind. Photos help the team.